Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
国产黄色录像播放视频| 国产v视频在线免费观看| 国产99久久久国产精品下药| 国产剧情av在线精品网站| 国产农村精品一级毛片视| 欧美精品久久久久久久蜜| 亚洲男人av在线| 韩国下部无遮挡图片| 东方东方欧美色二区亚洲| 亚洲日韩欧美制丝袜国产| 歪歪羞羞嘿咻汗汗av禁漫天堂| 午夜影视一区二区三区| 强壮公次次弄得我高潮a| 亚洲第一男人一av网站| 国内精品久久久久影院薰衣草| 97国产精品亚洲精品| 日韩欧美大片网站| 九一偷拍熟妇| 国产精品56p| 少妇激情一区二区| 极品美女销魂少妇女慰| 一本久久a久久精品综合| 偷偷碰偷偷鲁免费视频一区| 在线观看A片一区二区三区| 99热久久免费频精品18| 91国偷自产一区二区| bl受不了太粗太深| 中国少妇xxxxxx做受| 91色国产电影在线观看| 韩国三级做爰高潮姜恩惠| 天堂a√中文在线地址网站| 国产a一区二区三区| 尤物视频网国产在线观看| 成人片男女做受在线观看| 午夜精品小蝌蚪| 国产精品久久久久久久婷婷| 亚洲色欲久久久久综合纲| 扒开老师双腿猛进入爽爽视频| 熟女人妻第85页| 骚人妻自拍| 粉嫩虎白女毛片人体|